Fully variable from zero to 100% load applied in a cascade configuration allows the designers to have up to 6 individual heat pumps assigned to separate functions on a priority basis delivering any and all sources of cooling and heat rejection but on standby to be called if one load exceeds its capabilities. Being fully variable allows the system to ramp up or down both the percent of output and performance optimizing energy consumption. As an example, if the system is connected to 3 heat pumps designed to make ice and reject heat for subsoil warming, flood water, DHW , snowmelt for pit or external areas of the building along with pool heat, at any time if there is not enough heat to be provided, the GEOIce system recognizes the call and switches its operation from ice making to hot water to meet the demands of the system. In this application the GEOIce system can deliver up to 160Deg F water if needed delivering the most diversified and automated geothermal system available.