Ice Arena Dehumiidification
This last week I found myself in South Jersey installing a hybrid dehumidification system in a two slab ice arena using geothermal heat pumps and thermal energy storage as my system base. All the project coordination in the world could not help us on this one, as the 8 heat pumps that were supposed to be manufactured on July 1st never showed up. Having said that, there was plenty of work to do including installation of over 2000 feet of 2″ diameter HDPE pipe fused with socket fusion to ensure a perfect seal and leak less provision for many many years. The some of the pictures are shown here. I will follow up with more details as the system is installed Charged and commissioned.