DSB Management And Associates has been an advocate for clients globally reducing all forms of overhead. In its history it has trained over 200 individuals and companies to master the approaches employed by DSB.

Gallery

Contact

+416-333-9306

1975 Lewis Lane Orillia, Ontario Canada L3V6H2

info@dsbmanagement.com

Worlds First Hydronics Snow Melt Pit

World’s FIRST, (that we know of). Here we just finished the base or floor for a snowmelt pit designed to maintain the ambient water temperature mid 60’s, after each ice resurfacing. Circulating water from the heat reject tank or hot tank through the walls and floors allows the water to heat from all sides. There is no damage to the heating coils as they are tucked neatly into the concrete walls and floors. The radiant heat from the walls above the water surface keeps the Zamboni room warm without auxillary heat.

Author

dsb@Admin

Leave a comment

Your email address will not be published. Required fields are marked *

Free Quote

Please enable JavaScript in your browser to complete this form.
Name
Click or drag a file to this area to upload.